Skip to content
  • Home
  • About
  • Services
    • Inspection Services
      • Rig Inspection Services
      • Lifting Services
      • NDT Inspection Services
      • NDT Methods
      • Pipeline Inspection
      • Storage Tank Inspection
      • Welding Inspection
      • Long Range UT
      • Explosion Proof Inspection
      • Tubular Inspection Services
    • Dropped Object Surveys
    • Calibration And Testing
    • Drilling Services
  • Contact Us
  • Login
  • Home
  • About
  • Services
    • Inspection Services
      • Rig Inspection Services
      • Lifting Services
      • NDT Inspection Services
      • NDT Methods
      • Pipeline Inspection
      • Storage Tank Inspection
      • Welding Inspection
      • Long Range UT
      • Explosion Proof Inspection
      • Tubular Inspection Services
    • Dropped Object Surveys
    • Calibration And Testing
    • Drilling Services
  • Contact Us
  • Login

QC-B-07-25-0411

July 16, 2025 Uncategorized
001 9” DRILL COLLAR AFTER REPAIR BOX AND PINDownload
002 8” DRILL COLLAR AFTER REPAIR PIN AND BOXDownload
003 8” DRILL COLLAR AFTER REPAIR PIN AND BOXDownload
004 8” DRILL COLLAR AFTER REPAIR BOX SIDEDownload
005 5-1-2” HWDP After Repair BOX AND PINDownload
006 5-1-2” HWDP After Repair PIN SIDEDownload
007 5-1-2” HWDP After Repair BOX SIDEDownload
008- 6-3-4” DRILL COLLAR AFTER REPAIR PIN AND BOXDownload
009-CROSS OVER PIN SIDE AFTER REPAIRDownload
010-SPECIAL SUB BOX SIDE AFTER REPAIRDownload

Contact Us

Al TAKAMUL COMPANY FOR ENGINEERING TESTS
AND PROFESSIONAL SAFETY LIMITED

Address:

Basra, North Rumaila, 
Quality Control Yard - Iraq

Email:

OP@qualitycontrol-iraq.com
hany.akafi@qualitycontrol-iraq.com

Call us:

+9647810009138
+9647834964657

Quality Control © 2024. All Rights Reserved