Skip to content
  • Home
  • About
  • Services
    • Inspection Services
      • Rig Inspection Services
      • Lifting Services
      • NDT Inspection Services
      • NDT Methods
      • Pipeline Inspection
      • Storage Tank Inspection
      • Welding Inspection
      • Long Range UT
      • Explosion Proof Inspection
      • Tubular Inspection Services
    • Dropped Object Surveys
    • Calibration And Testing
    • Drilling Services
  • Contact Us
  • Login
  • Home
  • About
  • Services
    • Inspection Services
      • Rig Inspection Services
      • Lifting Services
      • NDT Inspection Services
      • NDT Methods
      • Pipeline Inspection
      • Storage Tank Inspection
      • Welding Inspection
      • Long Range UT
      • Explosion Proof Inspection
      • Tubular Inspection Services
    • Dropped Object Surveys
    • Calibration And Testing
    • Drilling Services
  • Contact Us
  • Login

QC-ATS-WSH-08-24-0136

August 21, 2024 Uncategorized

001 5-1-2” Drill Pipe AFTER REPAIR Pin SIDEDownload
002 5-1-2” Drill Pipe AFTER REPAIR Pin SIDEDownload
003-BOTTEL NECK X-OVER#032 BOTH SIDE AFTER REPAIR –Download
004- BIT SUB#BF113559 BOX SIDE AFTER REPAIRDownload
005- TDS SAVER SUB#BA-23-10 PIN SIDE AFTER REPAIRDownload
006- TDS SAVER SUB#BA-23-9 PIN SIDE AFTER REPAIRDownload
007- TDS SAVER SUB#8788 PIN SIDE AFTER REPAIRDownload
008- PUP JOINT #021 BOX SIDE AFTER REPAIRDownload
009- PUP JOINT #022 BOX SIDE AFTER REPAIRDownload
010- PUP JOINT #023 BOX SIDE AFTER REPAIRDownload
011- 8′ DRILL COLLAR AFTER REPAIR Pin SIDE –Download
012- 8′ DRILL COLLAR AFTER REPAIR BOX SIDE –Download
013- 6 1-2′ DRILL COLLAR AFTER REPAIR PIN SIDE –Download

Contact Us

Al TAKAMUL COMPANY FOR ENGINEERING TESTS
AND PROFESSIONAL SAFETY LIMITED

Address:

Basra, North Rumaila, 
Quality Control Yard - Iraq

Email:

OP@qualitycontrol-iraq.com
hany.akafi@qualitycontrol-iraq.com

Call us:

+9647810009138
+9647834964657

Quality Control © 2024. All Rights Reserved