Skip to content
  • Home
  • About
  • Services
    • Inspection Services
      • Rig Inspection Services
      • Lifting Services
      • NDT Inspection Services
      • NDT Methods
      • Pipeline Inspection
      • Storage Tank Inspection
      • Welding Inspection
      • Long Range UT
      • Explosion Proof Inspection
      • Tubular Inspection Services
    • Dropped Object Surveys
    • Calibration And Testing
    • Drilling Services
  • Contact Us
  • Login
  • Home
  • About
  • Services
    • Inspection Services
      • Rig Inspection Services
      • Lifting Services
      • NDT Inspection Services
      • NDT Methods
      • Pipeline Inspection
      • Storage Tank Inspection
      • Welding Inspection
      • Long Range UT
      • Explosion Proof Inspection
      • Tubular Inspection Services
    • Dropped Object Surveys
    • Calibration And Testing
    • Drilling Services
  • Contact Us
  • Login

QC-ATS-WSH-08-24-0137

August 26, 2024 Uncategorized
013 LIFTING SUB PIN SIDE AFTER REPAIRDownload
001 5” HWDP After Repair PINDownload
002 5” HWDP After Repair BoxDownload
003 8′ DRILL COLLAR AFTER REPAIR PIN SIDEDownload
004 8′ DRILL COLLAR AFTER REPAIR BOX SIDEDownload
005 8′ DRILL COLLAR AFTER REPAIR PIN& BOX SIDEDownload
006 6-3-4′ DRILL COLLAR AFTER REPAIR PIN SIDEDownload
007 6-3-4′ DRILL COLLAR AFTER REPAIR BOX SIDEDownload
008 6-3-4′ DRILL COLLAR AFTER REPAIR PIN&BOX SIDEDownload
009 8”JAR#2451 PIN&BOX SIDE After RepairDownload
010 6-1-2”JAR#3-11-4 PIN&BOX SIDE After RepairDownload
011 BIT SUB AFTER REPAIR BOX SIDEDownload
012 LIFTING SUB PIN SIDE AFTER REPAIRDownload

Contact Us

Al TAKAMUL COMPANY FOR ENGINEERING TESTS
AND PROFESSIONAL SAFETY LIMITED

Address:

Basra, North Rumaila, 
Quality Control Yard - Iraq

Email:

OP@qualitycontrol-iraq.com
hany.akafi@qualitycontrol-iraq.com

Call us:

+9647810009138
+9647834964657

Quality Control © 2024. All Rights Reserved